In the 4th quarter of 2013 WDPP was commissioned in the town of Labitnangi.
Main characteristics of the WDPP:
Installed capacity: | 250kW |
Tower’s height: | 30m |
Wind turbine caliber: | 26m |
Cut-in-wind speed: | 3.5 m/s |
Maximum speed: | 25 m/s |
Survival speed: | 50 m/s |
Manufacturer: | OOO “Tulganskiy elektromechanicheskiy zavod” |
This WDPP is adapted to the Arctic conditions (rated to -50 degree Celsius). For this, JCS Mobile Energy has developed complex equipment improvements for this system.
Expected annual production of WDPP is 545 000 kW. Payback time – 10 years. Expected service life is more than 20 years. WDPP User the affiliate of JCS Mobile Energy DPS “Labitnangi”
Thematic links:
Main isolated power center characteristics of the town Labitnangi
Population: | 26 300 |
Consumer load max: | 28mkW |
Consumer load min: | 7.5mkW |
Installed capacity DPS: | 73mkW |
Potential diesel energy production substitution: | 0.4%/td> |
The WDPP 250kW installed in the town of Labitnangi is an experimental unit. Experience, acquired during the WDPP’s construction, will be further implemented in the construction of new projects in the Arctic zone.